Project 10: The effective thickness of a socket, measured in hundredths of a millimeter using a special gauge had to be designed to measure the thickness For each time (t=1,...,20) we list the measurements in form of a 4 x 5 table where the 4 rows represent the 4 cavities (cavities I, II, III, and IV) and where the 5 columns represent the 5 cycles (cycles A, B, C, D, and E). 15 16 17 16 18 time=1 10 13 11 10 10 7 8 10 7 10 8 9 10 10 10 13 18 15 15 15 time=2 9 10 11 8 9 7 11 10 10 9 10 13 13 10 9 14 14 18 14 14 time=3 9 10 10 12 9 8 10 9 10 8 8 9 10 8 9 14 15 15 15 14 time=4 10 10 11 11 10 7 9 12 10 10 11 12 11 10 13 12 13 13 12 13 time=5 8 7 8 7 7 5 6 8 5 4 4 4 5 3 4 14 15 17 14 13 time=6 7 11 12 8 6 6 4 7 6 5 4 7 6 5 4 12 12 13 13 11 time=7 6 6 6 6 7 4 5 4 4 6 4 4 5 4 5 13 15 16 14 13 time=8 9 8 7 7 8 10 8 6 7 5 6 6 8 6 5 15 16 17 14 13 time=9 11 13 11 13 8 9 9 6 8 10 9 10 11 9 5 13 13 14 13 13 time=10 7 8 7 6 7 4 5 6 5 5 5 5 6 6 5 13 16 13 16 18 time=11 10 8 10 10 11 8 7 8 7 11 11 10 9 10 10 16 18 18 16 13 time=12 13 8 8 10 7 13 10 10 6 7 9 6 8 7 7 13 18 18 14 13 time=13 11 10 9 10 10 14 9 10 9 7 9 12 11 11 6 13 13 14 14 14 time=14 7 8 9 8 8 6 6 7 6 6 6 7 6 6 6 13 15 18 15 14 time=15 7 12 10 10 7 7 8 12 12 6 11 12 12 12 6 15 14 15 14 12 time=16 6 7 8 6 10 7 10 8 6 6 6 8 7 9 7 14 16 14 13 14 time=17 9 10 13 7 6 6 5 5 7 5 7 7 4 7 5 12 15 15 15 14 time=18 9 7 8 10 9 5 7 6 6 10 6 8 7 12 12 17 15 18 18 17 time=19 10 10 12 12 6 5 9 7 8 7 7 7 5 12 8 18 16 17 14 13 time=20 8 10 11 10 7 7 7 7 10 5 10 7 9 8 8